Also referred to as floor-box, floor-distributor, socket-distributor, floor-tank, floor-socket, or underfloor-tank, with electrical sockets, distributors, antenna and media sockets, compressed air connections, water and sewage connections as underfloor distributors for indoor areas such as residential buildings, canteens, shopping malls or industry, as well as for outdoor areas such as gardens, marketplaces, railway stations or airports. Standard dimensions are from 300 x 300 x 120mm to 600 x 600 x 600mm. The lid is made from 15mm high grade steel and are watertight to grade IP68 (complete continuous submersion). Surcharge (superimposed load) is structurally factored up to 40 tonnes. All our floor tanks are individually manufactured to the tiling and/or flooring thickness of each construction project. Assembly with StarConnex modules offers interchangeability and the option to combine required fittings of all industry sectors and manufacturers with each other.
We offer this type of construction under the designation floor tank or stainless steel floor tank, generally also known as underfloor tank, underfloor distributor, floor socket, or floor electrics. Due to the possibility of connection to screed ducts and the modular equipment the use remains flexible in the long term. Sockets such as British Standard, German/Austrian, Swiss, Belgian/French and US-American standard can be freely combined, different circuits can be spatially separated. As pure media tanks, we offer versions with hole patterns, for example for Neutrik D-Form. For underfloor heating systems we offer floor tanks with heating distributors or pre-equipped for this purpose. Our wide range of cable socket covers offers fixtures suitable for every installation scenario.
DIMENSIONS:
L 300 / W 300 / H 150 mm
Removable cover, IP68, wheel load 1-20 to.
3 places for assembly modules size M3 = 109 x 89 mm.
Version for electrical equipment. Combination with feed water is not possible with this size.
Outside and and in case of a water connection a drain module M3-321 is required. Behind the sockets, the space can be divided into sections for different voltages.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 300 / W 300 / H 120 mm
removable cover, IP68, wheel load 1-20 to.
1 slot for assembly module size 3 = 109 x 89 mm
(in the picture TAMM a flat version and only water and sewage)
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 300 / B 300 / height 150 mm
removable cover, IP68, wheel load 1-20 to.
2 places for assembly modules size 3 = 109 x 89 mm
In the picture TAMM version with Storz coupling for waste water, with connection thread 2" on the underside. 2 supply water connections are also possible.
INTERIOR AND EXTERIOR
Distance between module place and bottom tank wall opposite 296 mm.
Version for mounting on raw concrete. For mounting on screed channel or in hollow floor, the supply water connection can also be provided on the underside.
DIMENSIONS:
L 300 / W 300 / H 150 mm
removable cover, IP68, wheel load 1-20 to. 6 places for assembly modules size 3 = 109 x 89 mm
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 400 / W 400 / H 150 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
4 places for equipment modules size 3 = 109 x 89 mm
3 places when lid is hinged
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 400 / W 400 / H 150 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
8 places for equipment modules size 3 = 109 x 89 mm
6 places when the lid is hinged
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 400 / W 400 / H 150 mm
Removable cover, IP68, wheel load 1-20 to.
2 places for equipment modules size 3 = 109 x 89 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Hinged lid is not possible here
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 400 / W 400 / H 150 mm
Removable cover, IP68, wheel load 1-20 to.
4 places for equipment modules size 3 = 109 x 89 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Hinged lid is not possible here
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 400 / W 400 / H 250 mm
Removable or cover, IP68, wheel load 1-20 to.
6 to 7 places for equipment modules size 3 = 109 x 89 mm
4 places when the lid is hinged
Outside a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 400 / W 400 / H 250 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
12 places for equipment modules size 3 = 109 x 89 mm
8 places when the lid is hinged
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 400 / W 400 / H 250 mm
Removable cover, IP68, wheel load 1-20 to.
4 places for equipment modules size 3 = 109 x 89 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Hinged lid is not possible here
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 400 / W 400 / H 250 mm
Removable cover, IP68, wheel load 1-20 to.
8 places for equipment modules size 3 = 109 x 89 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Hinged lid is not possible here
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 500 / W 500 / H 150 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
5 places for equipment modules size 3 = 109 x 89 mm
4 places when the lid is hinged
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 500 / W 500 / H 150 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
10 places for equipment modules size 3 = 109 x 89 mm
8 places when the lid is hinged
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 500 / W 500 / H 150 mm
Removable cover, IP68, wheel load 1-20 to.
3 places for equipment modules size 3 = 109 x 89 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 500 / W 500 / H 150 mm
Removable cover, IP68, wheel load 1-20 to.
6 places for equipment modules size 3 = 109 x 89 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 500 / W 500 / H 250 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
8 places for equipment modules size 3 = 109 x 89 mm
(6 places when the lid is hinged)
or 3 places for equipment modules size 4 = 169 x 126 mm
(2 places when the lid is hinged)
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 500 / W 500 / H 250 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
16 places for equipment modules size 3 = 109 x 89 mm
(12 places when the lid is hinged)
or 6 places for equipment modules size 4 = 169 x 126 mm
(4 places when the lid is hinged)
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 500 / W 500 / H 250 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
6 places for equipment modules size 3 = 109 x 89 mm
(4 places when the lid is hinged)
or 2 places for equipment modules size 4 = 169 x 126 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
DIMENSIONS:
L 500 / W 500 / H 250 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
12 places for equipment modules size 3 = 109 x 89 mm
(8 places when the lid is hinged)
or 4 places for equipment modules size 4 = 169 x 126 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 600 / W 600 / H 150 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
6 places for equipment modules size 3 = 109 x 89 mm
4 places when the lid is hinged
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 600 / W 600 / H 150 mm
Removable or hinged cover, IP68, wheel load 1-20 to.
12 places for equipment modules size 3 = 109 x 89 mm
8 places when the lid is hinged
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 600 / W 600 / H 150 mm
Removable cover, IP68, wheel load 1-20 to.
4 places for equipment modules size 3 = 109 x 89 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Removable cover, IP68, wheel load 1-20 to.
8 places for equipment modules size 3 = 109 x 89 mm or
4 laces for equipment modules size 4 = 169 x 126 mm
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
DIMENSIONS:
L 600 / W 600 / H 250 mm
4 places for equipment modules size 4 = 169 x 126 mm
The picture shows a special version without modules to accommodate more sockets.
2 places for modules 89 x 109 mm in separate compartment,
e.g. for 1 ot 2 fresh water modules or 1 distribution module 18 TE
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows assembly example
4 places for equipment modules size 4 = 169 x 126 mm
The picture shows a special version with two separate compartments:
2 places for modules 89 x 109 mm in separate compartment,
for 1 ot 2 fresh water modules
and
2 places for modules 89 x 109 mm in separate compartment,
for 1 distribution module 18 TE
Outside and and in case of a water connection a drain module M3-321 is required.
Available for mounting on raw concrete, on screed duct and in hollow floor.
Picture shows an assembly example. From 2020, distributors in StarConnex Floor Tanks are generally designed as IP68 waterproof welded 19" racks if they are destined for outdoor use, as shown here.
Do you have any questions? Please do not hesitate to contact us